Thursday, April 12, 2007

road diets for hamilton?

A road diet for the city to cut the traffic

Image
hs1608807 2007-04-12-1
An intrepid cyclist takes the bridge on Valley Inn Road, a small road which may be closed to cars.
Hamilton Spectator File Photo
THE HAMILTON SPECTATOR
(Apr 12, 2007)
A man from Hamilton's traffic department is poised at a flip chart, marker in hand. He's frozen, not moving.
David Cohen, a member of the audience at the public meeting, is waiting for his comment to be added to the list on the chart paper.
The man at the chart refuses to move, his Sharpie wilfully restrained from touching the page. He will not, indeed appears incapable of, writing the words on paper.
The words he won't write?
"Hamilton needs more traffic congestion."
Recalling this event, Cohen infuses it with meaning, a metaphor for institutional resistance, resistance frozen in time.
"Since the 1950s, we've created conditions for automobile travel at the expense of other ways of getting around. Congestion was the issue then and is still the issue; so, are we going to do something to make it more convenient to use cars?" he asks rhetorically.
"If history has any meaning, we will only crowd up those streets and expressways with more cars."
In other words, catering to cars hasn't paid off, unless you consider the payoffs to be air pollution, traffic-related deaths and injury (more than 800 fatalities a year in Ontario) and frequently clogged major highways due to "accidents" and traffic volume. Most wouldn't.
To shift the emphasis to other modes of transportation, Cohen advocates creating conditions "more conducive to transit and less conducive to cars."
The way to escape congestion is, counter-intuitively, to take space from automobile traffic and give it to other uses: transit lanes, roadside parking, wider sidewalks, bicycle lanes. Call it a road diet.
Hamilton has a disproportionately high amount of arterial roads and expressways compared to other Ontario cities. We weigh in at second highest with 7.1 "lane metres" per capita. Toronto has 3. So a diet seems in order.
Taking a Robin Hood approach to existing roads, i.e. stealing lanes from cars to give to other modes, would serve to calm traffic (making things slower, thereby safer) while creating the kind of infrastructure needed for intrepid cyclists and transit users to get ahead.
But what about the displaced automobile traffic? Cohen's assertion is that congestion, accompanied by beefed up alternatives, is precisely the thing required to move drivers toward sustainable alternatives. He figures people would think twice before hopping in the car when transit or bikes are moving faster.
Further support for road diets comes from a major British study published in the New Scientist, based on 60 cases worldwide where a road's carrying capacity was reduced. As recounted by the late urban-issues writer Jane Jacobs:
"When a road is closed, an average of 20 per cent of the traffic it carried seems to vanish. In some cases they studied, as much as 60 per cent of the traffic vanished. Most of the cases involved urban areas ... The report at hand is a logical extension to a 1994 finding that building new roads generates traffic."
Cohen uses Hamilton's Main Street as an example of a road whose only purpose is moving cars, a "traffic sewer" that displaces other modes of travel and opportunities for businesses to develop.
"Main Street between Dundurn and Queen should be busy with pedestrians and business but it just moves cars and trucks," he laments. "Cars and trucks are zooming along a curb; it's not only unnerving but it is completely wrong if you want street life, amenity and business. There's a huge potential to redevelop along these arteries. Bike lanes could be part of that."
Not far away, Ward 1 sports a nice example with recent work on King Street West just west of Longwood.
Adding an island pedestrian refuge, plus bicycle lanes on both sides of the street means a formerly four-lane road is now two lanes. It's a safer crossing point for primary school kids and cyclists finally have some room of their own.
It costs about $700,000 to repave one kilometre of four-lane road. That's almost the price needed to prevent a damaging fare increase from torpedoing the HSR. Yet all we hear is how fares should go up to cover the costs of transit, while roads drag their bloated bottom line under the radar of public outrage.
Another way to save money on roads is to close them to auto traffic. Closing a small road like Valley Inn Road to cars, (which is in the works), will have a positive effect on the natural integrity of the area at the mouth of Grindstone Creek. We should be looking for more opportunities to scale back roads in order to create islands of restored nature, neighbourhoods and business areas.
By following a path that downsizes roads, we can make room for other users, save money on roads that could be spent on transit or an alt-trans staff position, while ensuring we have more access to clean, quiet, safe areas to explore in the city. Road diets could help get the city in shape for the tough climate-change years ahead. And with more opportunities for active modes like cycling and walking, a trimmer population as a happy byproduct.
Randy Kay lives in Dundas and writes occasionally on issues involving alternative and sustainable transportation.

Tuesday, April 10, 2007

'Cyclists ticked' over budget cut

Image
hs1607749 2007-04-10-1
Cycling advocates are refusing to meet to advise Hamilton until a city co-ordinator is hired and council restores its annual funding of $300,000 for bike projects.
Hamilton Spectator File Photo
THE HAMILTON SPECTATOR
(Apr 10, 2007)
The decades-old volunteer Hamilton Cycling Committee is suspending its monthly meetings to protest the axing of the city's annual cycling budget.
The group advises city hall on cycling projects and says the cut reveals a lack of effort in combating auto dependence and pollution as urged in city documents like the new Transportation Master Plan.
In budget talks, councillors voted last month not to spend the usual $300,000 on cycling projects in 2007. Advocates call it a wrong turn if Hamilton ever wants to become a bike-friendly city.
"If they are willing to drop this $300,000, what kind of commitment does the city have to cycling?" committee chair Daryl Bender said. "These kinds of hiccups are very frustrating."
Adds Randy Kay, of Transportation for Livable Communities: "They dropped it for the second time, the other being 2003, the year of the world cycling championships, ironically.
"Cyclists are ticked they are getting dropped off the budget. It's not a lot of money, and it gives a big bang for your buck," Kay said.
The $300,000 cycling budget, which pays for things like bike trails and paths, has been accumulating, going unspent due to capital project delays. Councillor Brian McHattie says about $650,000 collected is already earmarked for approved projects -- but is caught in a backlog.
Advocates say the lack of a dedicated cycling staffer at City Hall is causing the backlog. Others say a new hire is not in the cards.
"Could we spend it faster if we hired a co-ordinator? Sure we could," said Councillor Terry Whitehead, adding it's not the time to expand staff when social service cuts may be a trade-off.
Kay said bike projects are typically overseen part-time by junior traffic department staff, with turnover so high basic information isn't updated online and questions go unanswered.
Councillor Sam Merulla, who supported the cut, said it's wrong to ask for $300,000 more from taxpayers if it won't be spent in 2007 due to the backlog.
"Nobody is anti-cycling. I know there's a spin going out there right now," Merulla said.
Bender said the cycling committee is calling off its meetings because with no new money allotted in 2007, there's nothing to advise the city on regarding future cycling projects. The committee won't meet again until council hires a full-time cycling staff person, and restores the $300,000 in funding.
Still, Bender and Kay are optimistic about local cycling, thanks to recent victories like bike racks on HSR buses. But they too see challenges.
"It's a chicken and egg: we are not spending the money because we don't have the staff to do the projects, and if we don't change that, (the projects) are not going to happen," McHattie said.
rfaulkner@thespec.com 905-526-2468
CYCLING
Transportation Master Plan guiding philosophy
* Old Thinking
"Walking and cycling are only viable modes for a select group of people, and only for part of the year."
* New Thinking
"Walking and cycling accounts for 11 per cent of all morning rush hour trips. The fact that 50 per cent of all rush hour trips are less than 5 kilometres suggests there is potential to increase walking and cycling activity with spinoff environmental and health benefits."
PROJECTS
Projects the Hamilton Cycling Committee helped get done.
* Multi-use trail on the Beach Strip
* Bike lanes along Sterling Street, Markland Street
* Two-way bike lanes over the 403 on King Street West
* East-west bike corridor on Stone Church Road
* Ongoing installation of bike routes, paths and paved shoulders along North Service Road (Grays Road to Niagara region)
* Bike racks on HSR buses, expected this year
ENHANCEMENTS
From the city's proposed cycling enhancements:
* 66 kms of new on-street bike lanes
* 143 kms of new multi-use paths
* 60 kms of new shoulder bike lanes
* Incline railway
* Trail improvements
* And one goal is to increase the share of local trips made by bike, from current 6 per cent to 15 per cent by 2030.
"This is a modest target and one that can easily be exceeded if continued enhancements to cycling infrastructure are made," the Hamilton Transportation Master Plan states.

City Cycling Committee Calls it Quits: protest lack of action

Hamilton Cycling advocates react to lack of action on cycling and the cancelled $300,000 budget line for cycling in 2007 by "suspending operations"- the story, including quotes from TLC, in the local daily on line here

Wednesday, March 28, 2007

Alt Trans Axe Falls in Hamilton: Make some noise

For Immediate Release
Wednesday, March 28, 2007

Transportation for Liveable Communities PO BOX 19, 1280 Main Street West Hamilton ON L8S 1C0 905-525-9140 ext. 26026 tlchamilton(at)gmail.com

Transportation Advocacy Group says Hamilton is Driving Away Sustainable Transportation Options.
TLC opposes move to pull funding for cycling, walking and transit.

Since our inception in 2000, Transportation for Liveable Communities has been engaged in addressing a dysfunctional traffic system that prefers cars to cycling, walking and transit.

TLC's long awaited hopes for the city to take positive steps to improve infrastructure for alternatives to the private automobile have been devastated by the Committee of the Whole's decision to raise bus fares, drop the modest annual allocation for cycling improvements ($300,000), and to turn down a proposal for an alternative transportation coordinator position.

This is the second time in recent memory that the cycling budget has been dropped because previous year's money was not spent: TLC understands that the lack of spending has more to do with the absence of a staff position than anything else, since there is an obvious and urgent need for spending on a multitude of cycling projects.

In our experience, programs and infrastructure for cycling are continually falling years behind schedule, while frequent changes to city staff for cycling issues make follow through difficult. This situation leaves TLC with the clear realization that there is a strong correlation between the two. Hiring an alt trans coordinator would be the most efficient way to support cycling initiatives in the city.

The Transportation Master Plan, "intended to move the City towards the achievement of the objectives of Vision 2020 and are reflective of the 9 Strategic Directions to guide development decisions...identified as part of the GRIDS process, including Direction #6 - Expand transportation options that encourage travel by foot, bike and transit and enhance efficient inter-regional transportation connections," specifically states the need for a "permanent full-time staff position for Cycling and a permanent full-time position of Transportation Demand Management (TDM) Coordinator," as well as recognizing that "that planned population and employment growth over the next 30 years can be accommodated without the need for major new Escarpment crossings provided that viable alternatives to single occupant vehicles are fostered and developed"

By failing to pay the price in the budget (despite the fact the salary was to come from the annual cycling budget), we can expect more lip service to sustainable transportation when what we need is action.

Council's approach to the HSR: raising fares rather than taxes to support public transportation, hurts the city's potential to escape the jam we're in regarding traffic, air pollution, poverty, and pragmatic economic development in these global warming times. A serious look at area rating is long overdue. Making users pay the majority of the costs is not the answer.

In the big budget picture we're talking about small amounts, but amounts likely to deliver a huge payoff in terms of liveability and sustainability. For less than it costs to resurface a kilometer of four-lane road ($700,000) we could have the cycling budget and a staff position ($300,000) and still have half a million dollars to put toward transit; yet a majority of city councillors don't seem to recognize the value they would get.

By comparison, the City of Toronto has just allocated $3 million for next year's cycling budget.

"It's ironic that they made their decision to cut support for sustainable transportation during a poor air quality alert (March 28, 2007, Downtown Hamilton AQI 53), with pollution largely generated by roads and traffic" notes TLC. "We fail to see any logic in council's votes and we want the issues reconsidered."

Friday, March 23, 2007

Run Around the Bus

FOR IMMEDIATE RELEASE: Friday, March 23, 2007
Local group says "Run for the bus, don't drive to Around the Bay Road Race"

Local advocacy group Transportation for Liveable Communities is encouraging organizers of the Around the Bay Road Race, City Police and local media to promote transit as an option for people traveling to the weekend race.

"Nobody wants to be stuck in traffic, but given the fact this is a race of runners, extra traffic can only add unwanted air pollution. Taking transit, car pooling, cycling and walking are all viable alternatives to private automobiles in many cases," suggests TLC's Randy Kay. "We just want people to explore the options."

TLC is suggesting the Race web site include a link to info about transit to help people avoid parking hassles, help keep the streets from becoming congested, keep the air cleaner for the runners/walkers, and help people consider alternatives to the car.

LINKS:
HSR http://www.myhamilton.ca/myhamilton/CityandGovernment/CityServices/transit/
Burlington Transit http://cms.burlington.ca/Page146.aspx
GO - http://www.gotransit.com/
Greyhound http://www.greyhound.ca
VIA http://www.viarail.ca/en_index.html

TLC hopes the police and media will suggest transit as an option to keep things efficient, clean and safe.

Transportation for Liveable Communities is an all volunteer working group of the Ontario Public Interest Research Group (OPIRG) McMaster. Since 2000, TLC has been active promoting and advocating for sustainable transportation options in the city of Hamilton.

Thursday, March 15, 2007

Pedestrian safety and McMaster

The Silhouette
McMaster University's Student Newspaper, Online!
http://www.thesil.ca/
http://www.thesil.ca/article.pl?sid=07/03/15/2037254

TOM PERRY
THE SILHOUETTE
Thursday, March 15, 2007

One year after McMaster student Heather Watson was struck and killed by a vehicle while crossing Cootes Dr., a local action group is still fighting for progress to be made in pedestrian safety in and around McMaster University.

Watson was a second year Arts & Science student who was tragically struck by a City of Hamilton salt truck.

“We're definitely disappointed that not much is happening with regards to the situation because there's a lot of potential for improvement here,” said Randy Kay, member of the McMaster chapter of the Ontario Public Interest Research Group.

Kay, along with a number of city officials, police officers and independent parties, has formed an advocacy group called Transportation for Liveable Communities, which focuses on street safety in high traffic areas.

The group had been concerned with the danger posed by motorists in the area long before Watson's tragic death. They were able to effectively draw the city's attention to the issue.

“We petitioned the city about the danger of the area. They hired consultants who came in and did a thorough job studying traffic volumes and speeds with their technology. Their final analysis was that the area was very dangerous and they proposed the idea of a pedestrian controlled traffic light across Cootes behind the university,” recalled Kay.

Although a light was installed at the time of Heather's death, the accident did prompt the TLC members to continue pressing on in their fight for improved conditions. The group tabled a number of secondary safety recommendations for the area.

“One major improvement would be to get rid of the ‘ramp' from Main St. W. to Cootes Dr. and have traffic turn right at the intersection. That would definitely slow down vehicle speeds on that stretch of road,” said Kay, who also suggested narrowing lanes, implementing caution signs in the vicinity and condensing Cootes Dr. into two single lanes flowing in each direction.

According to Ward 1 councilor and TLC member Brian McHattie, some of these smaller scale initiatives are underway and very close to fruition. “The speed [on Cootes Dr.] will be reduced shortly as well as having signage posted on the bridge reminding drivers that they are entering a school zone, and to drive accordingly.”

The same cannot be said about TLC's long-term plans, such as lane reduction and narrowing behind the school, as the group has received little support from City Hall and other councilors involved in the decisions.

“There's not a lot of opposition for these safety initiatives until you get into road reconfiguration. The city and my colleague in Dundas are not very keen on changing the road around,” noted McHattie.
Some feel that while the traffic light has been a positive step in assisting street safety on the bustling thoroughfare, its technical flaws have produced equally negative effects.

“Many students weren't using the crosswalk effectively because the delay on the light was so long, people would get tired of waiting and run across through breaks in traffic,” said Kay, who was critical of the way the city's Traffic Engineering and Operations department dealt with the concern.

“They recognized that this was a problem and addressed it by adjusting the light to be more responsive off of rush hour. The city is very concerned with traffic backup,” added Kay.

McMaster student Patricia Consentino also commented on the situation. “I live on the other side of Cootes Dr. and I use the light everyday. Sometimes I get sick of waiting for the light to change and I just go when I see a clear path.”

This type of impatience is exactly what has Mike Hill, manager of Hamilton's Risk Assessment services, so frustrated with over the issue of street safety, to which he cited as the responsibility of the pedestrian. “Students show no regards for the rules of the community. We can't keep putting up barriers, people need to start taking accountability for their own actions.”

Andrew Blair, a third year McMaster student said it is up to the individual to take responsibility - whether it is a pedestrian or a driver. “If you're a pedestrian, make sure you're not stepping out in front of a moving car. If you're a driver, you have to realize that people can get seriously injured by your vehicle if you're not paying attention or being careless.”

Hill added that cost is a factor. “Infrastructure costs money and we have to get the message out to force people to do things in a responsible way, not just as they please.”

The infrastructure that Hill is referring to includes other streetlights in high traffic areas, such as near shopping centers and a handful of red light cameras strewn across the city to catch motorists who fail to beat the changing lights.

According to the City of Hamilton website, these cameras are responsible for an almost eight per cent decrease in intersection collisions throughout Hamilton.

However, this figure is somewhat contradictory to the Hamilton Police Services traffic report for 2004-05, which cites only a one per cent decrease in motor vehicle accidents. This statistic is paired with an increase of 16.6 per cent in vehicle collision fatalities, which rose from 17 in 2004 to 20 in 2005.

One proposed method to improve street safety in Hamilton is to desynchronize the traffic lights on King St. W. and Main St. W. to prevent speeding, though Kay does not see this as being the answer. “We suggested the city could deal with speed by altering the synchronized “green wave' to hold cars to a maximum 50km/h. This is something they could do right away to slow speeds and make the pedestrian climate much safer.”

Kay remains optimistic, especially in light of the recent change in the mayoral guard. “The city has always catered to the motorist, an example being all the one-way streets and arterial roads. They need to develop express bus lanes and more bike lanes. I do get the impression we'll get further with [Fred] Eisenberger than we did with [Larry] Dianni as there's indications of move towards more environmental programs.”

Wednesday, March 07, 2007

MARCH MEETING

TLC meeting, Monday, March 19, 5:00pm at McMaster University Student Centre room 229.
Agenda - Discussion and input on the City of Hamilton Transportation Master Plan

Monday, March 05, 2007

Dear Terry and Karen:

Thanks for this update. I hope that some of the actions will improve the traffic situation on Campus. I think that the efforts at the main street entrance will have a positive effect in the short term. I am sure that this will need constant attention until there is a more permanent solution such as a gated entrance and exit. Thank you for your efforts to try to reduce conflict between pedestrians/cyclists and cars. I will share this information with TLC.

Cheers, Jim


Dr. James S. Quinn, Professor, Biology Department
McMaster University


-----Original Message-----
From: Terry Sullivan [mailto:sullivan@mcmaster.ca]
Sent: 03 March 2007 21:15
To: '
Karen Belaire'; 'jim quinn'; 'Terry Sullivan'
Cc: 'Cathy O'Donnell'
Subject: RE: Main Street Entrance problems

Karen and Dr. Quinn,

Karen has mentioned some of the problems which we face while trying to resolve a problem with heavy traffic using our Sterling Street entrance. This coupled with about 450 HSR buses traveling through our University Ave results in a traffic flow that we try to manage. You may have noticed the improved style of crosswalk (piano heavy making) and the installation of stop signs midway through University Ave. We have also reviewed all crosswalks throughout the university and have or will be improving them.

I met with HSR and Councilor McHattie a week ago and expressed our support for moving the almost 100 HSR - Bee Line buses back to Main Street and off of University. There is a little conflict in that many of the passengers object to having it moved from the University Core and Main Street.

Beginning next week we will assign officers at the Main Street Entrance to ensure only those who should be using it will be doing so. All permit holders will be warned and turned around. Repeated attempts will result in tickets. We will report results to you on completion.

Sgt. O'Donnell will you assign the CP officer to this detail. Log times and results and develop plan to ticket repeat offenders.

Thanks.

Terry


From: Karen Belaire [mailto:belaire@mcmaster.ca]
Sent: Friday, March 02, 2007 2:46 PM
To: jim quinn; Terry Sullivan
Subject: Re: Main Street Entrance problems

Jim
I know that when we last exchanged emails I informed you of the challenges that the University was facing with the neighborhood association regarding traffic through the community. The result of that challenge was that HPS began ticketing all truck traffic . We then reached an interim solution with the neighborhood regarding the movement of truck traffic - the result is that it is moving through campus and we have implemented stop signs and crosswalk areas as well as escort services to ensure the safety of the pedestrians and cyclists on campus.
We are challenging this action with the city of Hamilton and it is taking longer than I would like to get this resolved. I won't bore you with the legal discussions , but I can tell you that they are continuing.
We have also been in discussion with HSR to address increasing bus traffic on the campus - and we have asked specifically for some buses to be moved off of our campus - again we wait for HSR to respond. HSR is not being an active participant in trying to find a solution to the traffic concerns. We have also engaged our lawyer to assist in these discussions.
We continue to monitor the traffic on campus and Terry Sullivan and the security staff do their best to catch people who are not abiding by our traffic rules - Unfortunately we do not have dedicated traffic security staff - they must do a lot of security services all across the campus and the staffing numbers have not been increased as the budget has been reduced in this area. On top of this we now have to provide escort services to the truck traffic.

I have copied Terry on your emails and he is doing his best to address your traffic concerns . We will do our very best to increase our ticketing of the traffic violators.

Terry may want to add some additional comments to this as he is closer to the action than I am.

Karen Belaire

staying on the case...McMaster Front Entrance

Friday, March 2, 2007


Dear Karen:

Although I have written three memo’s representing TLC on this issue between this and last year, I am writing today representing only myself, and mainly out of pure frustration. If you have been dealing with important personal or extenuating circumstances that have prevented responding to my last two messages, then I extend my best wishes for an upturn and look forward to an eventual reply to my those memos.

As a member of the original Main Street Entrance Steering committee I opposed many features of this entrance. The basis for my opposition, shared with other pedestrian/cycling advocates, was that the plan brought traffic onto the main campus and into conflict with cyclists and pedestrians unnecessarily. We lost the main arguments, being outnumbered by others that voted in favour of the basic plan. However, we won a number of concessions. Some of those concessions included physical structures, such as raised crosswalks, while others involved the operation of the Kiosk that was to ensure that only visitors to campus whom wished to pay and then park in lot 3 would be allowed to proceed through that entrance (buses, emergency vehicles etc. were to be exempted from this restriction). As time has gone by these “soft” or non-physical concessions have eroded away. TLC’s concerns have been expressed and the only response that we have received from you, dated January 15, 2007 (responding to questions that were initiated by my TLC memo to Dr. George dated June 6, 2006), did not address the concerns at all, deftly deflecting the campus traffic issue to an unrelated topic that was easy for you to rationalise, but was not the concern of our memo.

The past two storm events forced me temporarily to change my cycling route to campus, bringing me in through the main street entrance instead of across Cootes Drive. I have been frustrated to watch cars pass the kiosk in the open lane to the right and drive straight through to lot 3, despite assurances that a) non-visitors would not be allowed access to parking lot 3 through the main street entrance and b) folks would not be permitted to drive onto campus to drop passengers off. This was an issue that we had already identified during meetings of the steering committee. We were assured that this problem would be circumvented. It would appear that there is no intention to follow through on this promise, or that it is failing.

In addition to concerns over the operation of the Main street entrance there have been other changes to the roads on campus. There have been crosswalks and stop signs put in place. I do not know whether this has normalised driving through parts of campus that are designated only for pedestrians, buses, and service vehicles, but I am seeing more and more traffic that appears to be students and other folks driving through from the south west parts of campus (including from the Main street entrance) through campus to Sterling street or the parking lots near the Sterling street entrance. Many of those cars, especially after dark, seem to be travelling at high rates of speed as if they think this is now an open thoroughfare. While I recognise that this was not the intention of the changes, and it may not even be related to these changes, more drivers seem to be ignoring the small signs designating non-traffic areas and traveling on campus past the front of Life Sciences and Divinity college. This increased danger might be reduced by more prominent signage and increased efforts to enforce.

I am frustrated and would like to see some positive changes that favour pedestrians,cyclists and safety over unsustainable transportation and danger!

Sincerely,

Jim


Dr. James S. Quinn, Professor, Biology Department
McMaster
University, Hamilton, ON, L8S 4K1


Wednesday, February 28, 2007

Rural Trail Development: Letter to council


Dear Councillors,

Transportation for Liveable Communities is a working group of the Ontario Public Interest Research Group (OPIRG) McMaster.
TLC's mandate is to advocate for and support local sustainable transportation initiatives promoting cycling, walking, transit as viable alternatives to single-occupancy vehicle use.

We understand that the City of Hamilton staff has spent considerable amount of time and tax payer money preparing the Hamilton Trails Master Plan and the Transportation Master Plan - Class Environmental Assessment (PW07022), both readily accessible on the useful City of Hamilton web site.

The documents have been presented after extensive public consultation, in which many TLC members have participated over the past few years.

We thus were surprised to learn that councillor Dave Mitchell, in the February 19 public works committee meeting, apparently brought about the premature demise of over 70 kilometres of proposed new multi-use trails from the Transportation Master Plan.

TLC desires to see the integrity of the public process already undertaken supported and not undermined by what, unfortunately, presents itself as personal fiat.

We do not dismiss Mr. Mitchell's concerns outright, but opt for a process that would provide necessary safeguards required by our valued local agricultural sector.

We could point to the pleasant experience of cycling through farm country along the wonderful Hamilton to Brantford rail trail, part of the Trans Canada Trail that links our community to a national network of trails, and is a highly valued tourist attraction.

We support careful evaluation of a trail designated for a specific hydro corridor, which we trust can readily be done via the 30-day public comment period. However, we strongly disagree with the sudden removal of 70 kilometres of new multi-use trails from the Transportation Master Plan. This elimination bluntly violates the principles underlying the plan.

In conclusion, we hope that councillor Mitchell will join us in seeking equitable solutions on the issue of rural trail development. There is a great deal of potential to increase quality of life for Hamiltonians and visitors to the city by having an integrated trail system that showcases the many facets of life in Hamilton, urban and rural alike.


With kind regards,

Reuven Dukas
for Transportation for Liveable Communities
tlchamilton.blogspot.com
905-525-9140 ext. 26026
tlchamilton@gmail.com

Friday, February 23, 2007

stopped-up grocery lane

The Hamilton to Brantford Rail Trail - pictured here looking eastward from the east side of the Main West Fortinos Supermarket parking lot, was recently blocked by these large stones (backpack in photo for scale) which allow pedestrians and cyclists passage, but not bicycles with trailers, for example.

The rationale for blocking the path this way was, we're told, to prevent Fortinos' shopping carts from being taken through.

The issue was raised with the local councillor and he has directed staff to find out how to open it up so cyclists can cart groceries, or children in bicycle trailers.

We'll keep you posted!

Tuesday, February 20, 2007

These cowboy boots not made for walking...?

Got this from Citizens at City Hall:

"CATCH News – February 19, 2007
Rural cycling and walking trails strenuously opposed by Mitchell

A proposal to use rural hydro corridors as cycling and walking trails was forced off the table today by Glanbrook councillor Dave Mitchell. The move could eliminate up to half of the new multi-use trails called for in the city’s transportation master plan.

“There’s no way I want people riding their bikes or just thinking they can free willy walk across there,” declared Mitchell. “I can’t take my skidoo or ATV on their front lawn and rip the hell out of it, so I don’t want them walking across farmland either.”

The expanded trail network is intended to meet a target in the plan of “increasing the share of daily trips that are made by cycling or walking from the current level of 6% to 15% by 2030” by providing safe routes and promoting active transportation.

The plan presented to public works committee today promises 143 kilometres of new multi-use trails, with over 70 kilometres earmarked for hydro corridors.

But it enraged Mitchell who said he had previously told staff to remove them and had been promised that would happen.

“You cannot dictate to the agricultural community that in 2031 or whenever it is that you’re going to have paths going through the middle of prime agricultural land,” Mitchell declared. “I asked for them to be taken out before. I am led to believe they got put back in by mistake, but they should not go out to the public with them in here because it’s hugely misleading.”

Director of capital works, Gerry Davis, agreed that they were “supposed to be deleted” and promised to ensure that happened before the plan is released for a 30 day public comment period required by the environmental assessment process. However, further questioning by committee chair Margaret McCarthy revealed that the trail proposals have been before the public for several months.

“It’s out there in draft from the public meetings in September,” confirmed Davis.

To fulfill the requirements of the class environmental assessment process, the amended transportation master plan will now be released for a 30-day public comment period.

_______________________________________________________________________________
CATCH (Citizens at City Hall) updates use transcripts and/or public documents to highlight information about Hamilton civic affairs that is not generally available in the mass media. Detailed reports of City Hall meetings can be reviewed at www.hamiltoncatch.org. You can receive all CATCH free updates by sending an email to info@HamiltonCATCH.org.

[end]

NOTE - This is the same councillor who blamed environmentalists for causing damage in Red Hill Valley by walking on trails - while he supported the building of the red hill creek expressway.
-r

Thursday, February 01, 2007

Following Up and Holding...

Dear Karen:

Thank you for acknowledging my e-mail of January 15 on behalf of TLC and for updating us about various traffic issues at McMaster and Westdale.

TLC members look forward to your thorough consideration and relevant reply regarding the two related serious safety issues we raised in our e-mail of January 15.

Briefly, we are concerned that a large proportion of vehicles entering through the Main St. entrance do not stop at the "welcome booth", thus putting pedestrians and cars in conflict, and request that changes be made to ensure legitimate use of that entrance. Our preferred solution is the construction of bars operated by the staff at the booth.

Additionally, we are alarmed by proposals calling for eliminating the staffing of the staffing of the booths at the campus entrances. Please see our January 15 e-mail immediately below.

We look forward to hearing from you.


Dr. James S. Quinn

Friday, January 19, 2007

Reply, in the Main, misses the Concern

Jim,

Thank you for your email.

You should be aware that the local councilor Brian McHattie and the neighborhood in Westdale have applied significant pressure on the University with respect to traffic and they have forced us to take construction traffic and service vehicles through campus. There have been a lot of meetings with Hamilton Police Services and the local politician and the University has been forced to do this.

Basically the neighbours want all of our traffic of their streets and sent through the centre core of our pedestrian campus - this is a real challenge that we are facing right now.

Things could get worse - I wish I had better news. We have been juggling zoning and planning issues, by law issues, ticketing by HPS and so on.

We are continuing to work with the city to try to find a workable solution.

On the plus side we were successful with our negotiations with GO transit to install a transit terminal on the west side of main campus - behind the clarke centre - this has resulted in all GO buses coming off the campus to the periphery - it should open later this month - and there is a drop off area in that location as well.
We are also close to completion of our plans for the College Cres/Cootes entrance to improve pedestrian safety . A number of new initiatives are coming from this.

Long discussions with the city - again.

Karen Belaire

Main (Entrance) Concern

Karen Belaire, VP Administration, McMaster University
Dear Karen:

I am writing on behalf of Transportation for Liveable Communities (TLC), a working group of McMaster’s chapter of OPIRG (Ontario Public Research Interest Group).

TLC members have been pleased to see some major improvements to pedestrian safety on campus, most notably, the additional pedestrian zebra-crossings.

We are, however, displeased to note that, a year and a half after our letter to Dr. George, and your reply to us (attached), the necessary major safety improvements have not been implemented and there are even hints of proposed changes that would actually DECREASE pedestrian safety on campus.

In spite of your explicit promises in your letter of August 22, 2005, there is little control over entry of vehicles via the Main St. entrance. In a few sample periods taken by TLC members, the majority of cars passed through without checking in with the attendant. Many of these cars also kept driving through the two stop signs at the intersections in front of the Psychology Building. We find this unacceptable and believe that the only sustainable solution is to erect stop signs AND bars at the welcome booth, which would allow only controlled entry to campus. Bars should also be installed at the two other entrances to campus at Sterling St. and Cootes Dr. This may be combined with the proposed change to electronically controlled entry to the parking lots.

We should also note that, as far as we know, your promise of August 22, 2005 to implement a safe passenger drop off location has not been materialized. Not unexpectedly, significant dangerous traffic on campus currently consists of cars racing through heavy pedestrian areas and even manoeuvring outrageous U-turns in intersections crowded with pedestrians in order to drop off a passenger and then leave as fast as possible.

Finally, TLC has again heard that your reinstated promise of August 22, 2005 for a regularly staffed 'welcome booth' may not materialise, and that McMaster’s Security and Parking Services intend to modernize parking technology and eliminate the staffed booths at the campus entrances. We certainly encourage the introduction of new technology, but request that such technology would be designed to increase rather than compromise pedestrian safety on campus. For example, the use of beacons and bars at entrances could be used to eliminate all but service and emergency vehicles on certain roads, and entry to parking lots only to cars with proper permits.

Regardless of changes to parking control, we think that the welcome booth at the front entrance must be staffed as promised to us on several occasions. We also urge you to promptly implement the old promises regarding limiting car entry to campus only to the bare minimum through proper measures such as the ones outlined above.

We look forward to hearing from you,

Sincerely yours,

Jim

James S. Quinn, Ph.D.
For Transportation for Liveable Communities.

Dr. James S. Quinn Professor Biology Department McMaster University Hamilton, ON L8S 4K1 (905) 525-9140 ext 23194 quinn@mcmaster.ca http://www.science.mcmaster.ca/biology/faculty/quinn/quinn.htm

Thursday, December 21, 2006

A tale of two cities?

Hi Randy,
Yes, there will be a bike lane through the underpass.
Rick
-----Original Message-----
From: randy opirg [mailto:randy@opirg.org]
Sent: Thursday, December 21, 2006 10:12 AM
To: Craven, Rick
Cc: D'Amelio, Carol; Dennison, Jack; Fitzpatrick, Rosemary; Jackson, Cam; Taylor, John; Thoem, Peter; Rudy, Jo-Anne; g-tlc@mcmaster.ca
Subject: King Road

Dear Rick,
When work proceeds for the rail underpass on King Road, are there plans to include a safe cycling passage? I have used that route before to get between the North Service Road bicycle lanes and the bicycle route on Plains (and the excellent bike lanes on King Road south of there). King Road would make a great connecting link for cyclists on what is now a fairly dangerous stretch. Bicycle lanes would be a welcome enhancement.

I encourage Burlington to continue the good work you have embarked upon supporting sustainable transportation.

Any news about plans for a safe cycling link along King Road would be much appreciated,

Thanks for your time,

Randy Kay

cc council
city cycling committee
transportation for liveable communities


Why does it seem to be so much easier to get cycling infrastructure in Burlington, compared to Hamilton? NOTE: Rick Craven is the ward councillor in Burlington, Ontario.

Tuesday, December 19, 2006

Governor's Reply

From: Powers, Russ < russ.powers@hamilton.ca>
Date: Dec 18, 2006 1:08 PM
Subject: RE: School Zone Safety on Governors Road
To: TLC <tlchamilton@gmail.com>

Your issues are noted and will be considered as the process moves forward.

- - - -

(read TLC's Letter to Councillor Powers)

Sunday, December 17, 2006

Governing Governor's

PO Box 19, 1280 Main Street West, Hamilton ON L8S 1C0
tlchamilton.blogspot.com
g-tlc@mcmaster.ca
905-525-9140 ext. 26026

Monday, December 18, 2006


Dear Councillor Powers,

Transportation for Liveable Communities (TLC) is a working group of the Ontario Public Interest Research Group (OPIRG) McMaster. TLC works to achieve balanced sustainable transportation solutions in the city of Hamilton.

We are writing to draw attention to the traffic situation on Governor’s Road in Dundas.

With the new Dundas West elementary school under construction on Governors Road at Bridlewood, there will be three schools (including Highland Secondary School and St. Bernadette’s elementary school) on this short stretch of highway (less than 1km).

The statement of a problem can make all the difference when seeking solutions. TLC is concerned that a solution you offered on your web site during the recent election campaign begins with the assumption that “traffic flow” is the problem on Governor’s Road, and offers road widening as a solution.

TLC feels that this is the wrong assumption and a desperately wrong conclusion.

The problem, as we see it, is traffic flows all too well the majority of the time on Governor’s, and that the speed of that flow puts school children and other pedestrians, cyclists and drivers at risk.

As you are likely aware there is a direct correlation between traffic speed and pedestrian fatalities:

Fig. 1 U.K. Department of Transportation, 1987. Killing Speed and Saving Lives, London, UK DOT.

Generally the only time traffic slows down on Governors is during “rush” hours, when the presence of too many single occupancy vehicles all going in the same direction at the same time creates a situation that is, from a pedestrian and cycling point of view, actually safer in terms of collision impacts. We should be aiming for a 30km/h maximum speed limit in the school zone.

TLC would thus prefer to pose the question: “what measures can be employed to create a safe and healthy environment for children using active methods of getting to school (i.e. cycling, walking) and to engineer a safer roadside environment for area residents outside of school hours?”

The City of Hamilton’s Public Health department recognizes the need for safe routes to school:

“Concerns about health and pedestrian safety among our children and air quality issues are prompting us to rethink the way we choose to get around in our communities,” said Sue Connell, Public Health Nurse with the City of Hamilton. “Obesity and inactivity in young children are reaching unprecedented levels and are creating serious health problems in our children. Vehicle transportation contributes to air pollution and smog and our children are especially vulnerable to the impacts of poor air quality. Many of the school zones in the Hamilton area are unsafe because of traffic concerns because large numbers of children are being transported to and from school. By walking to school with their parents or caregivers, children have an excellent opportunity to learn and develop their pedestrian skills.”

newsandpublications/newsreleases/ 2005news/september/05-09-30.htm

Road widening would only allow for increased vehicle speeds and make crossings more dangerous than the current situation, and run counter to the goals of the Transportation Master Plan currently under consideration by the city, and the goals outlined in Vision 2020:
  • To develop an integrated sustainable transportation system for people, goods and services which is environmentally friendly, affordable, efficient, convenient, safe and accessible.
  • To encourage a shift in personal lifestyle and behaviour towards transportation choices that enhance personal health and fitness, save money, and have the lowest environmental cost.

It is imperative that we get the necessary improvements in place as opportunity presents itself. And it is important that proper engineering is applied to ensure safe outcomes.

When slowing or ‘calming’ traffic, the right design invites the right driver response. The guiding principle of traffic calming is to influence motorist speeds and behavior through good design whenever possible, rather than by traffic control measures such as traffic signals and STOP signs.

There are many design and engineering tools that can be used to slow down traffic and make it safer for children to walk and bicycle to school including;
  • Narrow lanes
  • Chokers and chicanes
  • Speed humps
  • Raised pedestrian crosswalks
  • Neighborhood traffic circles
  • Reduced corner radiiSpeed sensitive signals
Source: http://www.saferoutesinfo.org/guide/engineering/slowing_down_traffic.cfm

Proper consideration must be given to effective traffic calming design if we are to be supportive of active modes of transportation like walking and cycling. Lane narrowing, the addition of bicycle lanes, wider sidewalks, a traffic median, a pedestrian crossing are all potential treatments that could enhance the safety of the school zone.

Surely the concentration of schools on this dangerous roadway makes safety considerations a priority for the city to address in a timely fashion.

TLC is happy to assist by being part of a public process that effectively deals with the worthy goals of providing safe and active routes to school, and improved cycling and walking facilities for area residents.

TLC would appreciate your prompt response and an outline/timeline of the next steps you intend to take.

We look forward to hearing from you in the near future.


Randy Kay

For Transportation for Liveable Communities