Sustainable transportation advocacy in Hamilton ON, est 2000
Saturday, December 22, 2012
STOP! Is this Hamilton's first bike-traffic light?
Saturday, April 21, 2012
Bike Boon
"one-way streets are among the biggest barriers for a lot of cyclists. Even confident riders like himself can find it daunting to make a left turn off Main Street, where multiple lanes of traffic make it impossible to signal your way across the road."
One sweet ride
Ditching four wheels for two keeps these Hamiltonians green and serene — not just on Earth Day, but year-round
Kenneth Moyle says his morning commute isn’t long enough. Sometimes, to drag it out, he leaves his Westdale home and heads downtown for coffee, before going in to work at McMaster University. Related Stories
Friday, April 20, 2012
Dundurn Road Diet with Bike Lanes
Next week, Hamilton’s Public Works Department will install bicycle lanes on Dundurn Street North between York Boulevard and King Street West, bringing the City’s total on-street cycling network to 130kms.
Currently, Dundurn Street has two auto lanes northbound and one auto lane southbound. When the new bike lanes are installed, this configuration will be modified to one auto lane in each direction with separate bike lanes in each direction.
The bike lanes on Dundurn North will connect to the well-established bike lanes on York Boulevard by Dundurn Castle, a connection through Victoria Park towards downtown Hamilton, and the popular cycling connection over Hwy. 403 to Westdale and McMaster University.
"This represents another key link in the Ward One and city-wide cycling system,” said Councillor Brian McHattie. “This link will encourage more folks to leave their car at home when traveling for short trips in west Hamilton. The next step is to work with Fortinos/Loblaws to connect the Dundurn bike lanes. My goal is to see the Ward One cycling system in place by 2014.”
This project builds on the existing bike lane network on Dundurn Street South, which connects to the recently extended Hamilton-Brantford Rail Trail via Glenside Avenue, the existing Chedoke Radial Rail Trail up the escarpment and signed cycling routes on Herkimer Street and Charlton Avenue.
Monday, January 09, 2012
Not There Yet...
Some observations based on the "Bike Friendly" article from the Hamilton Spectator, January 9, 2012 (copied below).
"delayed" - while it's understandable that delays with specific projects will occur, the big delay not mentioned is the potential 40-year timeline to implement the cycling network based on city council spending.
"$300,000 per year" has been the amount annually budgeted for cycling since well before the updated Shifting Gears Cycling Plan, and has had years where this amount was cancelled (most notably in 2003 during World Cycling Championship in Hamilton). This rate would mean the cycling network would have trouble being completed even in the long 40 year time frame quoted. The city would need to spend $1.25 million a year to complete only the urban portion, or $2.5 million to complete the urban and rural plan in 40 years.
"Patchwork, disconnected" is an ongoing complaint with bike lanes ending abruptly and leaving cyclists to contend with multiple lanes of vehicles including transport trucks.
"high speed traffic" is one of the unaddressed problems in the city, and traffic calming, like two-way traffic on what are now fast and wide one way streets, should be implemented sooner rather than later to make streets safer for all users.
"better parking facilities" - nothing says you're not welcome like a lack of bike parking at key destinations.
"separated infrastructure...along major roads" - while other cities like Ottawa, Vancouver and Toronto are moving toward physically separated lanes to encourage more people to cycle, there is nothing in Hamilton's cycling plan acknowledging this latest innovation. Major roads have not been included in the Shifting Gears cycling plan and cyclists feel this is to keep cars moving as fast as possible while relegating bicycles to back streets along disjointed routes.
"new lanes currently planned" - the list given here are lower city streets primarily west of downtown; are other city wards getting lanes, or are they getting cancelled?
Friday, October 21, 2011
Official Opening of Rail Trail extension over Highway 403
Councillor McHattie's office is extending an invitation to cyclists to attend the official opening of the new rail trail extension from Kirkendall to West Hamilton, past the railyard and over Hwy 403. A formal ceremony to celebrate the opening happens Wednesday, October 26 at 10 a.m. on the west side of the railyard at Stroud - so show up to celebrate cycling style!
Note that the city is still waiting for a decision from the Niagara Escarpment Commission about the cycling path link between Studholme and Glenside, across the Chedoke Golf Course.
Wednesday, September 28, 2011
Smooth Ride for West Enders Tomorrow
This significant and long-awaited cycling link is nearing completion, with lighting and landscaping and some fencing to follow the paving.
They city will maintain the trail all year, removing snow in winter, which will make this a popular trail for cyclists, hikers and joggers.
Built on an abandoned CP rail line, the trail extends from Studholme Road in the east, to the Main West Fortinos plaza and the Hamilton to Brantford trail head at Ewan Road to the west (Project #3 on TLC's Shifting Gears Cycling Master Plan map: click here to view) providing a safe, car-free crossing over highway 403.
A link to Glenside Avenue through the Chedoke Golf Course will further strengthen this connection linking South West Hamilton to neighbourhoods south of McMaster University, and into Dundas.
Monday, December 07, 2009
east mountain trail trouble

Eric McGuinness
STONEY CREEK — Peko Roic argues that putting asphalt along the Mountain Brow behind his home isn’t the right way to compensate for putting a highway down the Red Hill Valley.
He leads a small group trying to stop the City of Hamilton and Hamilton Conservation Authority from building the first phase of the East Mountain Trail Loop, intended to help replace 70 hectares of green space lost to construction of the Red Hill Valley Parkway.
Roic thought the three-metre-wide trail would follow the Bruce Trail, which runs close to the brow, not through woods further south, skirting his property on Ashbury Lane, off Paramount Drive west of Felker’s Falls.
He feels the trail will lead to loss of privacy, late-night noise and vandalism.
“What we are opposed to the most is that it’s going to be asphalt,” he said in an interview. “If the surface was granular, we wouldn’t necessarily have a problem with that.”
The dispute is important because construction of the 10-kilometre, multimillion-dollar, multi-purpose trail was to have started this fall. It’s now stalled until the matter is settled.
The homeowners are using a wrinkle in the law to appeal a development permit issued to the city by the Niagara Escarpment Commission for portions of the trail through Paramount Park and at the top of Red Hill Valley, even though the section past their homes is owned by the conservation authority.
“”It makes dealing with this case awkward,” says commission planner Martin Killian, explaining that municipalities need a permit to build trails on escarpment land, while conservation authorities are exempt.
Sandy Bell, manager of design and development for the authority, said last week it was “making adjustments to the alignment to bring neighbours on side,” but Roic said no deal was reached at a Wednesday-night meeting.
The parties are to appear before Ontario’s Environmental Review Tribunal at 10 a.m. Tuesday in the council chambers at the Stoney Creek Municipal Service Centre, 777 Hwy. 8, to continue a preliminary hearing that began in October. If the matter isn’t resolved, a full hearing is scheduled to begin Jan. 19.
emcguinness@thespec.com
905-526-4650
Friday, July 04, 2008
lake lanes
No media showed up to the official opening of the extended Waterfront Trail linking Confederation Park with Niagara Region, but the weather was great, and alternative transportation staff Daryl Bender (pictured, left) and Hart Solomon, head of traffic department (right) were there to officiate for a small assemblage of cycling citizens, including Councilors Bob Bratina (ward 2, downtown) and Maria Pearson (ward 10, the area with the cycling improvement being celebrated)."North Service Road - a well defined cycling route, comprised of a combination of on-street bike routes, on-street painted bike lanes, and off-road multi-use pathways, between Confederation Park and Fifty Point Conservation Area"Sure enough, enjoy the lake breeze!
Sunday, June 15, 2008
catching up with some trail development
*Major west end trail expansion*
A major addition to the walking and cycling trail system in west Hamilton will provide a direct link between the the Kirkendall neighbourhood and the Dundas Valley. A proposal www.myhamilton.ca/NR
The agreement would see the city purchase a 900 metre right of way from the Fortino’s property on Main West to Stroud Avenue, and sign a 20-year lease for an additional 820 metres across the 403 connecting Stroud to Studholme Avenue. A final 350 metre section of trail would run along the north edge of Chedoke Golf Course.
An existing rough and narrow path along the rail line has been used informally by cyclists for several years as an off-road route across the 403, but that practice has had no legal sanction. That would be replaced by a 5 metre wide paved path, with a narrower section along the golf course.
The city already has an agreement that links Fortino’s with the Ewen Road terminus of the popular Hamilton Conservation Authority rail trail that extends into the Dundas Valley and on to Brantford, Paris and Cambridge forming a 90-kilometre off-road trail system. At the other end, the new trail would link with the radial line path up the escarpment from Chedoke to Mohawk Road.
The agreement requires an independent appraisal of the property being sold, but there is already agreement between CP and the city that the purchase price won’t exceed $725,000 – an amount the staff report http://www.myhamilton.ca/NR
Some of the property may be contaminated so the report warns that “the offer to purchase will be contingent on the outcome of the site investigations, and if unexpected conditions are found, this may require abandoning of the project, renegotiation or alternate action.”
However, provincial regulations exempt trail projects from some cleanup requirements since there is usually little or no disturbance of potentially contaminated soils. Staff note that some excavation may be necessary if a decision is made to install lighting along portions of the trail, so they are recommending soil testing before the deal is finalized.
Funds for the purchase were approved in last year’s capital budget. A one-time payment of $150,000 for the 20-year lease would be covered by the annual cycling budget.
Staff say the golf course section – which would require “some relocation of golf tees” – has been worked out with neighbours by ward councillor Brian McHattie.
“Staff and councillor McHattie met with the neighbours , the consultant and a representative of Hamilton Police Service on site last summer and the proposed layout was satisfactory to them,” notes the report, “although the police specifically suggested that for maximum safety the path through the golf course not lighted to discourage night-time use.”
While giving city residents direct access to the recreational trails in the Dundas Valley and beyond, the new route will also provide commuter cycling links with the university and the Innovation Park research development planned for Longwood Road.
“The trail is the missing link in a circular route which connects to trails at the top of the escarpment and provides a safe riding environment and excellent scenery and perspective of the centre of Hamilton”, notes the staff report. “Recreational cycling is a key intermediate step to encourage citizens to consider cycling as a commuting mode.”
CATCH (Citizens at City Hall) updates use transcripts and/or public documents to highlight information about Hamilton civic affairs that is not generally available in the mass media. Detailed reports of City Hall meetings can be reviewed at www.hamiltoncatch.org http://www.hamiltoncatch.org/. You can receive all CATCH free updates by sending an email to info@HamiltonCATCH.org .
Monday, June 09, 2008
ups and downs
Dana Brown
The Hamilton Spectator, (Jun 9, 2008)
The long-awaited east Mountain stairs are finally open.
Despite opposition and delays, metal steps leading from the Escarpment Rail Trail to Mountain Brow Boulevard are cemented into the landscape.
"It's long overdue," said cyclist Jay Jespersen, 31, out for a ride during yesterday's blazing heat.
The steps are located about 300 metres east of the lower set, which run from the trail to Kimberly Drive near the Kenilworth Traffic Circle.
Although Jespersen likes having the new steps as a point of access to the Mountain, he would've liked to have seen the stairs continue farther down.
"It'd just be nice to have a straight run up," he said.
Construction on the steps started last fall after the province gave the city the go-ahead in the spring.
Area residents opposed to the stairs were unhappy with the Niagara Escarpment Commission's decision to allow construction and took their appeal to the Environmental Review Tribunal.
The tribunal approved the project, but because of a technical error in documents, the final decision was bumped up to then minister of natural resources David Ramsay.
Residents were concerned the stairs would bring an undesirable element and destroy a treed section of the escarpment.
Wendy Darby, wife of residents' spokesperson Grant Darby, said so far there haven't been any huge issues with the stairs.
"Now that they're here, we'll probably use them," she said.
Darby said there has been an increase in the number of parked cars in front of the couple's home and she has seen a number of youths hanging around the stairs.
She also suggested that, given the traffic changes and increased pedestrian traffic, a proper pedestrian crosswalk at the corner of Mountain Brow and Margate Avenue would be a good idea.
Before the metal steps were built, residents relied on Uli's Steps, a homemade construction of 145 stairs, to get down to the rail trail. A second homemade set continues down to near the Rosedale pool.
Rita Leonard, 47, still uses Uli's Steps although she has also been using the new stairs since they opened.
"These ones are a little bit more challenging," she said, noting that the metal construction seems steeper.
The city is planning an official opening for the stairs for June 25.
905-526-4629

