Showing posts with label road diet. Show all posts
Showing posts with label road diet. Show all posts

Thursday, December 20, 2012

Burlington Lakeshore - Left Turn or Bike Lanes?

"This was to be dealt with Dec. 3, but is deferred at least until January, coinciding with a public information centre on the sewer and road work. It also provides time for people who knew nothing about this to call their councillors. Staff contacted the Burlington Cycling Committee, which supports it."

CONTACT INFO FOR BURLINGTON COUNCIL: http://cms.burlington.ca/Page110.aspx

LITTLE: Lakeshore bike lane pilot both costly and frustrating

Hamilton Spectator, Dec. 20/12

A pilot project would eliminate the centre turning lane and add a bike lane on each side of Lakeshore Road, writes columnist Joan Little.

Any Burlington driver who ever uses Lakeshore Road will be left gasping in amazement at the latest hare-brained scheme for it.

There’s already frustration about its unnecessary narrowing at Brant Street, and resultant congestion, but wait till you hear about a “pilot project” from late summer to early fall in conjunction with the 2013 regional water main replacement from Torrance Street to Guelph Line. The pilot would eliminate the centre turning lane and add a bike lane on each side. The cost for painting lines on the new configuration is $35,000.

Councillor Jack Dennison wants the pilot extended easterly to Walkers Line. That would add $45,000 and be all summer — spring to fall. Tourist season. More bike lanes? Great! But bike lanes that totally disrupt traffic flow?

Fortunately, thanks to Councillor John Taylor, there’s a reprieve. This was to be dealt with Dec. 3, but is deferred at least until January, coinciding with a public information centre on the sewer and road work. It also provides time for people who knew nothing about this to call their councillors. Staff contacted the Burlington Cycling Committee, which supports it.

[NOTE: Ward 2 Councillor opposes the pilot project]
[Mayor asks for comments on bike lanes at his blog]

A bit of background: Burlington approved a cycling master plan in 2009. It directed staff to investigate widening Lakeshore Road to Burloak, “maintaining two narrowed travel lanes and a narrowed two-way left-turn lane,” and to begin design work. [I couldn't find any reference to this in the plan; see below for the actual recommendations in the cycling plan - rk]

Friday, April 20, 2012

Dundurn Road Diet with Bike Lanes


Tourism Hamilton released this statement on their Facebook page today: 
Next week, Hamilton’s Public Works Department will install bicycle lanes on Dundurn Street North between York Boulevard and King Street West, bringing the City’s total on-street cycling network to 130kms.

Currently, Dundurn Street has two auto lanes northbound and one auto lane southbound. When the new bike lanes are installed, this configuration will be modified to one auto lane in each direction with separate bike lanes in each direction.

The bike lanes on Dundurn North will connect to the well-established bike lanes on York Boulevard by Dundurn Castle, a connection through Victoria Park towards downtown Hamilton, and the popular cycling connection over Hwy. 403 to Westdale and McMaster University.

"This represents another key link in the Ward One and city-wide cycling system,” said Councillor Brian McHattie. “This link will encourage more folks to leave their car at home when traveling for short trips in west Hamilton. The next step is to work with Fortinos/Loblaws to connect the Dundurn bike lanes. My goal is to see the Ward One cycling system in place by 2014.”

This project builds on the existing bike lane network on Dundurn Street South, which connects to the recently extended Hamilton-Brantford Rail Trail via Glenside Avenue, the existing Chedoke Radial Rail Trail up the escarpment and signed cycling routes on Herkimer Street and Charlton Avenue.